Well and borehole path
Sustained yield → demand → pump duty → pressure tank → bulk storage.
Start path →System hub / Phase 2
Connect source capability, pump duty, pressure control, stored water and roof collection before selecting equipment.
Keep sustained source capacity, peak demand and stored volume as separate quantities. Test dry and high-demand cases, not only annual averages.
Sustained yield → demand → pump duty → pressure tank → bulk storage.
Start path →Roof area → rainfall yield → first flush → tank simulation → end use.
Start path →Build a duty point from pumping level, pressure and losses.
Use tool →Compare sustained source production, daily demand and peak storage.
Use tool →Convert required run time into drawdown and nominal tank volume.
Use tool →Compare observed starts with a simple drawdown cycle model.
Use tool →Balance outage demand, refill, reserve and usable volume.
Use tool →Estimate roof collection after runoff and system losses.
Use tool →Step through 365 days of monthly rainfall, storage and demand.
Use tool →Convert a local diversion rule into required volume.
Use tool →Use globally variable source-water terms carefully.
Read guide →Connect yield, pump duty, controls, pressure and storage.
Read guide →Understand precharge, switch settings, run time and symptoms.
Read guide →Separate daily demand, peak use, refill and emergency reserve.
Read guide →Plan from horizontal roof area through treatment and end use.
Read guide →Build explicit average, peak, outage and refill scenarios.
Open reference →Combine elevation, pressure and losses.
Open pump tool →Compare Hazen–Williams and Darcy–Weisbach.
Open pump tool →Interpolate and compare up to three candidates.
Open pump tool →Estimate hydraulic, shaft and input power.
Open pump tool →Estimate suction head above vapor pressure.
Open pump tool →Groundwater and rainwater quality cannot be inferred from appearance or quantity. Protect source integrity, separate untreated rainwater from safe piped water, test for the intended use, and follow local well, plumbing, storage and public-health requirements. For a separately plumbed wastewater source, use the Greywater Reuse Planning workflow and preserve cross-connection controls.