What this tool does

Makes setup conflicts visible before a field team treats a numeric stabilization result as sufficient evidence.

When to use it

Use with surveyed well-construction data, measured initial and stabilized water levels, and limits copied from the approved site plan.

Inputs and supported units

Each labelled field explains the quantity it expects. Unit-system changes convert existing numeric entries once and keep calculations on a single SI internal basis. Supported shared units include L/min and GPM, metres and feet, kPa and psi, millimetres and inches, kW and hp, and °C and °F as relevant.

Calculation or decision method

Drawdown = stabilized depth to water − initial depth to water
Submerged head over intake = intake depth − stabilized depth to water

How to interpret the result

Read the primary result with the supporting breakdown and warning. A plausible number is not evidence that every input, operating case or design constraint has been included.

Worked example

For a 10–13 m screen, an intake at 11.5 m, initial water at 4 m and stabilized water at 4.08 m, drawdown is 0.08 m and 7.42 m of water remains over the intake.

Assumptions

Well construction, water levels, equipment dimensions, flow and field readings are site-specific measurements entered in consistent units. All comparison criteria are supplied by the user from the governing plan or authority.

Limitations

These tools calculate geometry, displacement and numeric variation only. They do not select a sampling method, prove sample representativeness, establish laboratory requirements or authorize collection or disposal.

Safety and review boundary. Follow the approved sampling and health-and-safety plans. Treat unknown groundwater and purge water as potentially contaminated; use qualified field staff, calibrated instruments, required PPE and lawful containment and disposal.

Sources